Do you have a question about the Arista DCS-7504N and is the answer not in the manual?
Provides essential safety precautions and references for laser products and disposal.
Guidelines to prevent ESD damage during installation and servicing.
Instructions for mounting 7504N and 7508N switches in two-post and four-post racks.
Procedure for mounting 7512N and 7516N switches using a shelf in four-post racks.
Guidance on connecting power supplies, including safety and airflow considerations.
Instructions for connecting the secondary ground for safety and ESD protection.
Instructions for connecting DC power supplies, including wire preparation.
Steps for preparing stranded copper wiring and lugs for DC power connections.
Explains how switches ship in ZTP mode and how to bypass it for manual configuration.
Step-by-step guide to manually configure the switch, including ZTP cancellation.
Process for replacing power supply units in the chassis.
Steps to safely remove an AC power supply unit.
Steps to safely remove a DC power supply unit.
Steps to install a new AC power supply unit into the chassis.
Steps to install a new DC power supply unit into the chassis.
Process for removing and replacing fabric and fan modules.
Steps to safely remove a fabric module.
Steps to install a new fabric module into the chassis.
Steps to safely remove a supervisor module.
Steps to install a new supervisor module into the chassis.
Steps to safely remove a linecard.
Steps to install a new linecard into the chassis.
| Operating Temperature | 0°C to 40°C (32°F to 104°F) |
|---|---|
| Form Factor | 4RU |
| Total Slots | 4 |
| Operating System | Arista EOS |
| Maximum 40GbE Ports | 144 |
| CPU | Dual Intel Xeon processors |
| Power Supplies | Up to 4 Hot-swappable |
| Redundancy | Power supplies, fans |











