Do you have a question about the Arista DCS-7808 and is the answer not in the manual?
Instructions for checking the equipment upon arrival and verifying contents.
Outlines the sequence of steps for installing the switch.
Directs users to safety warnings and guidelines.
Details the technical specifications of the modular switches.
Criteria for choosing an appropriate location for switch installation.
Instructions for safely unpacking and transporting the switch chassis.
Guidelines to prevent damage from static electricity during installation.
Details the process for mounting all supported switch models into four-post racks.
Provides guidance on connecting power supplies to the switch.
Instructions for connecting the switch chassis to the data center ground.
Details the process of connecting AC power supplies to the switch.
Instructions for connecting DC power supplies to the switch.
Explains how to configure power supply redundancy for the switches.
Instructions for connecting network cables to line card modules.
Tools and procedures for removing and inserting line cards and supervisor modules.
Procedures for installing and removing AC and DC power supplies.











