11
GB
CAUTION!
Installation should be performed by a
qualifi ed technician.
Before connecting the receiver, disconnect
the power supply to the boiler.
WARNING!
STATIC-SENSITIVE DEVICE,
HANDLE WITH CARE
- Disconnect the boiler from the power
supply.
- Insert the wires in the appropriate slot
(Fig. 4) and connect them to terminals
A and B.
- Connect the receiver terminal to ter-
minal TA1 on the boiler P.C.B. (Fig. 5).
- Connect the power supply wires.
- Power the boiler.
- Position the receiver onto the base by
inserting the two bulging ends on the
top part into their housings, then close
the receiver by pushing towards the
wall (Fig. 6).
4
N
N
FLAME
L
L
BUS
TB
FLOOR
TA2
SE TNK SOL TA1
CN14
CN13
CN19
CN1
CN15
CN2 CN11
CN4
1
11
CN8
CN25
1
CN6
1
1
CN9
1
1
1
1
CN6
ABCNLL
FLAME
BUS
TB
FLOOR
TA2
SE TNK SOL TA1
CN19
CN1
1
1
230V - 50H
BOILER P.C.B.
5
6