EasyManua.ls Logo

Ascendor PLG7 - Documentation; Tools Required for Maintenance; Inspection through Elevator-Inspector

Ascendor PLG7
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 8 Version 2.14 Maintenance and Service Manual
4.7 Documentation
After all previous mentioned checks are finished fill out the service plan.
You find the plan at the end of this manual (see chapter 16).
You should also write down the current hour counter and power blackout counter on the day of service.
To read this information please see chapter 8.3.
4.8 Tools required for maintenance
Set of Allen keys
Current analyser / measuring device (Multimeter)
Set of TORX (star head) keys / screwdriver
Sealing tape
various screw drivers (magnetic)
cleaning towels
set of open ended wrenches
slightly greasing stainless-steel spray
various pliers
lubrication spray
4.9 Inspection through elevator-inspector
In addition to the maintenance work carried out by service technicians the lift must be inspected once a year
by authorised elevator inspector. The inspector must be tasked by the operator.
In the course of the yearly inspection all safety equipment must be checked according to chapter 4.3.
! N O T E !
Only required if directed by national law!

Table of Contents

Other manuals for Ascendor PLG7

Related product manuals