EasyManua.ls Logo

ASTEC NT5C06D - Page 9

ASTEC NT5C06D
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents 9
Helios Rectifier 25/48 Installation and User Manual
RFA fault..............................................................................................................47
SEN FAIL fault......................................................................................................48
Erratic load fault...................................................................................................48
Current or voltage float fault ................................................................................48
Appendix A: Replacement parts.............................................................................. 49
Appendix B: Technical service assistance............................................................. 51
Local toll-free prefixes .................................................................................................51
Toll-free technical assistance numbers.........................................................................52
List of terms and acronyms..................................................................................... 53
List of Figures
Figure 1 - MPS75 Modular Power Shelf-NT5C10C with 8-pin signal cables .................13
Figure 2 - MPS75 Modular Power shelf- NT5C10C with 26-pin signal connectors........14
Figure 3 - NT5C06D Switch Mode Rectifier.................................................................14
Figure 4 - Power shelf common AC connection.............................................................21
Figure 5 - Power shelf individual AC connection...........................................................22
Figure 6 - Connecting the DC power shelf ....................................................................23
Figure 7 - No controller, remote sensing connection for 8-pin signal cable shelves........26
Figure 8 - No controller, remote sensing connection for a 26-pin signal connector
shelf...........................................................................................................27
Figure 9 - NT5C06D - front view..................................................................................34
Figure 10 - Power interface connections......................................................................39
Figure 11 - Control signal connections .........................................................................40
Figure 12 - NT5C06D rear view...................................................................................44
List of Tables
Table 1 - Electrical specifications.................................................................................15
Table 2 - AC cable wire size.........................................................................................21
Table 3 - AC Fuses.......................................................................................................21
Table 4 - DC cable wire size.........................................................................................23
Table 5 - Rectifier and Controller interface connections (8-pin connectors) ..................24
Table 6 - Rectifier and Controller interface connections (26-pin connector)..................24
Table 7 - Rectifier settings ..........................................................................................28
Table 8 - Indicators......................................................................................................35
Table 9 - System fault diagnosis..................................................................................47
List of Procedures
Procedure 1 - Installing the power shelf.......................................................................20
Procedure 2 - Verification ............................................................................................28
Procedure 3 - Rectifier installation procedure...............................................................28
Procedure 4 - Starting up the rectifier..........................................................................29
Procedure 5 - Adjusting the load share.........................................................................32
Procedure 6 - Adjusting the float / equalize ..................................................................41
Procedure 7 - Replacing the fan ...................................................................................43

Table of Contents