EasyManua.ls Logo

Asus P5BV-M - Page 26

Asus P5BV-M
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-6 Chapter 2: Hardware information
3. Lift the load lever in the direction of
the arrow to a 135º angle.
4. Lift the load plate with your thumb
and forenger to a 100º angle (A),
then push the PnP cap from the
load plate window to remove (B).
5. Position the CPU over
the socket, making sure
that the gold triangle is
on the bottom-left corner
of the socket. The socket
alignment key should t
into the CPU notch.
2. Press the load lever with your thumb
(A), then move it to the left (B) until it
is released from the retention tab.
To prevent damage to the socket pins, do not remove the PnP cap unless you
are installing a CPU.
A
B
Load lever
Retention tab
Load plate
PnP cap
4A
4B
3
Gold
triangle
mark
Alignment key
CPU notch

Table of Contents

Related product manuals