EasyManua.ls Logo

ATECH BCV 700 - Page 8

ATECH BCV 700
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Automatic Bottom Blowdown Control Valve
5. COMMISSIONING
• Be sure that all phase and neutral ends are connected to the right terminals.
• Be sure that compressed air supply is connected to the right port on the Namur/Solenoid Valve.
• From the Smart BC 700 Bottom Blowdownd Controller, the valve should be tested open and close the valve correctly.
Please see the "Smart BC 700 Bottom Blowdownd Controller Installation and Operating Instructions" for this.
6. MAINTENANCE
Please make sure to remove the main supply before detach the device.
Otherwise this may cause damage to the product, personal injuries or even death.
When any fault situation occurs or maintenance is necessary, please contact with “
Atech Service Department
It is recommended to perform the function tests regularly.
IM-BCV70022K Page 7
BCV 700
"Steam & Control Technologies"
www.atec h-ltd.com