EasyManua.ls Logo

ATI Technologies 2H User Manual

ATI Technologies 2H
27 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IQ/OQ
Installation / Operation
Qualification MANUAL
for the
2H and 2H-N
Aerosol Photometers
Air Techniques International
Division of Hamilton Associates, Inc
11403 Cronridge Drive
Owings Mills, MD 21117 USA
TEL: 410 363-9696
FAX: 410 363-9695
www.atitest.com
info@atitest.com
IQ/OQ 2H, 2H-N Revision 0

Questions and Answers:

ATI Technologies 2H Specifications

General IconGeneral
BrandATI Technologies
Model2H
CategoryMeasuring Instruments
LanguageEnglish

Summary

Installation Qualification

Requirements

Specifies environmental and power conditions for proper operation of the 2H Aerosol Photometer.

Unpacking

Instructions for carefully unpacking the 2H Aerosol Photometer and verifying all included items.

Setup

Locations & Functions

Identifies and describes the various ports, controls, and indicators on the front panel of the 2H.

Front Panel Controls and Indicators

Details the function keys, displays, and LED indicators on the 2H's front panel.

Scanning Probe Connections

Explains how to properly connect the optional Scanning Probe to the 2H unit.

Rear Panel Connections

Identifies and describes the components and connectors located on the rear panel of the 2H.

Side Connection

Details the RS-232 port located on the side of the unit for data output.

Operational Qualification

Initialization

Guides the user through the power-up sequence and initial setup for the 2H Aerosol Photometer.

Setup Parameters

Lists and describes the twelve operating parameters, including those programmable by the operator.

Changing Setup Parameters

Provides step-by-step instructions for modifying the 2H's programmable setup parameters.

Setting Up the Alarm Functions

Explains how to configure the unit's alarm feature for particle concentration alerts.

Changing the Reference

Details the procedure for selecting or re-establishing the internal reference for measurements.

Upstream Aerosol Measurements (DOP or PAO)

Outlines the process for measuring upstream aerosol concentration using specific challenge aerosols.

Measuring % Leakage - User Defined Reference (USER)

Describes how to measure % leakage using a user-defined reference point.

Testing with the 2H

Provides instructions on performing tests with the 2H unit after baselines are established.

Verifying the Upsream Concentration During Test

Explains how to check upstream aerosol concentration during testing operations.

Maintenance

Weekly

Details the routine weekly maintenance tasks required for the 2H Aerosol Photometer.

Annually

Outlines annual maintenance, including factory calibration and cleaning recommendations.

General Maintenance Procedures

Covers general maintenance, user-serviceable parts like fuses and filters.

Recommended Spare Parts

Lists spare components that can be ordered for user field replacement.

Cleaning the TDA-2SP Scanning Probe Screens

Instructions for cleaning the wire screens on the scanning probe.

Replacing the Main Power Fuses

Step-by-step guide for replacing the power fuses in the 2H unit.

Replacing the HEPA Exhaust Filter

Instructions for replacing the HEPA exhaust filter on the rear panel.

Related product manuals