Revision A
3
Table of Contents
1 INSTALLATION QUALIFICATION 6
1.1 Requirements 6
1.2 Unpacking 6
2 SETUP 7
2.1 Locations & Functions 7
2.2 Front Panel Controls and Indicators 8
2.3 Scanning Probe connections 8
2.4 Rear Panel Connections 9
2.5 Side Connection 10
3 OPERATIONAL QUALIFICATION 11
3.1 Initialization 11
3.2 Setup Parameters 11
3.3 Changing Setup Parameters 12
3.4 Setting Up the Alarm Functions 17
3.5 Changing the Reference 17
3.6 UPSTREAM AEROSOL Measurements (DOP or PAO) 18
3.7 Measuring % Leakage - User Defined Reference (USER) 18
3.8 Testing with the 2H 19
3.9 Verifying the Upsream Concentration During Test 19
4 MAINTENANCE 20
4.1 Weekly 20
4.2 Annually 20
4.3 General Maintenance procedures 20
4.4 Recommended Spare Parts 20
4.5 Cleaning the TDA-2SP Scanning Probe Screens 21
4.6 Replacing the Main Power Fuses 21