Preventive maintenance schedule
Daily and 3-monthly check list
Period Action
Daily Check oil level.
Check readings on display.
Check that condensate is discharged during loading.
Drain condensate.
Check the service indicator on the DD and PD filters (if provided).
3-monthly (1) Check coolers, clean if necessary.
Remove the air filter element. Clean using an air jet and inspect. Replace damaged or
heavily contaminated elements.
Check the filter element of the electric cabinet (where applicable). Replace if necessary
On Full-Feature units: Check condenser of dryer and clean if necessary. Check and
clean the filter
Yearly Replace DD and PD filters or whenever the pressure indicator points red (if provided).
Yearly inspect the air receiver. Minimum wall thickness as specified in the instruction
book must be respected. Local regulations remain applicable if they are more strict.
(1): More frequently when operating in a dusty atmosphere.
Preventive Maintenance schedule programmed in the Elektronikon
Running hours Operation
4000 (1) If Atlas Copco Roto-Foodgrade Fluid is used, replace oil and oil filter.
If Atlas Copco Roto-Inject Fluid is used, replace oil and oil filter.
Check the electrical connections. Tighten if required according to values indicated on
service diagram.
Replace the oil separator element.
Replace the air filter element.
Clean coolers.
Check pressure and temperature readings.
Carry out a LED/display test.
Check for leakages.
Check the condition of the air intake hose of the air filter.
On Full-Feature units: clean condenser of dryer and replace the filter mesh of the drain.
Test temperature shutdown function.
8000 (2) If Atlas Copco Roto-Xtend Duty Fluid is used, replace the oil and the oil filter.
Replace the non return valve of the scavenge line.
Replace the minimum pressure valve and the thermostatic valve. Remove carefully.
Replace the electronic drain (FF units).
Apply the unloading valve kit.
Test safety valve.
(1): or yearly, whichever comes first
(2): or every 2 years, whichever comes first
The indicated oil exchange intervals are valid for standard operating conditions (see section Reference
conditions and limitations) and nominal operating pressure (see section Compressor data). Exposure of the
compressor to external pollutants, operation at high humidity combined with low duty cycles or operation
at higher temperatures may require a shorter oil exchange interval. Contact Atlas Copco if in doubt.
Exchange interval for Roto-Inject Fluid