• Using the measurement shims, place the proper combination of shims into
the front of the rail making the gap slightly larger then the screw thread di-
ameter.
• Ex: For 4mm screw, use 1.0mm (1pc), +1.2mm (1pc) and 2.0mm (1pc)
measurement shims to equal a 4.2mm gap.
• With the measurement shims in place, tighten the screws from step 5, except
the rear screw, then remove the measurement shims.
Step 7 (Picture H)
Legend
1. Screw
2. Shim spacer
• Using the correct combination (same measurement as Step 6) of spacer
shims, insert the shims into the rear of the rail, secure them by reinstalling
the rear screw from step 5.
Note: angling the shims at approximately 15º will allow screws to slide
in the rail smoothly.
Step 8 (Picture I)
This step is only necessary if your screw thread diameter is greater than 2mm.
Legend
1. Stopper spring
2. Stopper
3. Screw
4. Washer
• Place the stopper spring under stopper and remove the screw and washer.
Install proper size stopper based on screw size.
• Reinstall washer and screw.
• Move stopper spring back to its original position.
Step 9 (Picture J)
Legend
1. Rail
2. Tab
• Carefully install rail back to machine paying close attention to the correct
position.
Note: Tab on the bottom of the rail must come into contact with the
metal on inside of the feeder.
Step 10 (Picture K)
Legend
1. Hex key
2. Screw
• Lock the rail and close the side gate.
Note: ensure side gate does not make contact with the rail, leave a small
gap between the rail and gate as to not allow a screw to become lodged
in gap.
Turn side gate screw counter clockwise to close.