EasyManua.ls Logo

Atlas Copco SDS - Page 15

Atlas Copco SDS
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SDS EN Installation
© Atlas Copco Industrial Technique AB - 9836 794200 00
15
Step 11 (Picture L)
Legend
1. Hopper
2. Screw
Make sure hopper is centered on the rail, if not, adjust the hopper from rear
of the machine by carefully loosening the two screws by 2 turns, make the
adjustment then tighten the screws.
Do not remove the screws.
Step 12 (Picture M)
Legend
1. Screw
2. Brush
3. Screw
Place a few screws into the rail below the brush.
Sweep brush across the rail.
The brush should not come into contact with the ramp and should just con-
tact the top of the screw heads
Do not force brush!
Step 13
Measure and record the head of the screw.
Step 14 (Picture N)
Legend
1. Measurement shim
2. Screw
Loosen the screws. These allow for up and down adjustment of the pedestal.
Using the proper combination of measuring shims, place the shims between
the pedestal and rail and lightly press down on the pedestal while tightening
the screws which will allow most accurate height adjustment, then remove
the shims.
Note: the gap between the rail and pedestal should be slightly more
then the actual screw head height.
Ex: For 2mm headed screw, used (1) - 1.0 and (1) - 1.2mm measure-
ment shims to equal a 2.2 gap.
Step 15 (Picture O)
Legend
1. Screw (adjust up and down)
2. Screw (adjust left and right)
3. Screw (adjust front to back)
4. Screw
5. Stopper
Place a screw in the rail just behind the stopper arm.
The faceplate should be centered with the rail and screw head allowing
enough pick up room for the screwdriver bit.
Screws (1): adjust up and down.
Screws (2): adjust left and right.
Screws (3): adjust front to back.