1310 3011 65 19
The solution must be made up before being introduced into
the battery.
4.7.2 Recharging A Battery
Before and after charging a battery, always check the
electrolyte level in each cell; if required, top up with distilled
water only. When charging batteries, each cell must be
open, i.e. plugs and/or cover removed.
? Use a commercial automatic battery charger
according to manufacturers instructions.
Apply with preference the slow charging method and adjust
the charge current according to the following rule of thumb:
battery capacity in Ah (amp hours) divided by 20 gives safe
charging current in Amps.
4.7.3 Battery Maintenance
Keep the battery clean and dry
- Keep the electrolyte level at 10 to 15 mm above the
plates or at the indicated level; top up with distilled water
only.
- Keep the terminals and clamps tight, clean, and
lightly covered petroleum jelly.
4.8 Storage
Run the compressor regularly, e.g. twice a week, until
warm.
Load and unload the compressor a few times to operate
the unloading and regulating components. Close the air
outlet valves after stopping.
? If the compressor is going to be stored without
running from time to time, protective measures
must be taken as described In a separate Service
Bulletin (ASB), which may be obtained on
request. Consult Atlas Copco.
4.9 Service Kits
A service kit is a collection of parts to fit a specific repair or
rebuilding task.
It guarantees that all necessary parts are replaced at the same
time which improves the uptime of the unit.
To purchase service paks contact your local Atlas Copco
representative.
250/750 hr. Pak: order number 1310300374
500 hr. Pak: order number 1310300375
1000 hr. Pak: order number 1310300373