Maintenance schedule
(continuation of page 44)
Daily 50 hours after initial
start-up
Every 6 months or
500 hours
Yearly or every
1000 hours
Intercooler Clean Clean
Torque of wheel nuts Check Check Check
Brake system (if installed) Check/Adjust Check/Adjust Check/Adjust
Safety valve (10) Test
Door hinges Grease Grease
Towing eye shaft or ball coupling and shaft Grease Grease
Bleed-off valve unloader Replace
Oil stop valve Clean
Rubber flexibles (12) Check
Shut-down switches Check
Pressure drop over oil separator element
(2) Replace
Fan V-belts (3) Adjust Adjust Adjust
Bleed-off valve unloader Replace
Fuel tank Clean Clean
Compressor oil (1) (8) Change
Compressor oil filter (6) Replace Replace
Coolant (9) (5) Analyse
Air filter element (1) Replace
Engine oil (3) (4) Change Change
Engine oil filter (3) Replace Replace
Primary fuel filter (AC filter) (7) Replace Replace
Fuel prefilter (3) (7) Replace Replace