EasyManua.ls Logo

Auber Instruments KIT-RSPb - Page 23

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10) Before re-installing the top cover, cut the excess tail of the cable ties. Check all connections
that have been changed. Make sure that there are no exposed wires or connectors that will
touch the top cover metal when it is installed. Some of the cables that stayed above the level
of the cover when fitted will move when the cover is installed. If that cable has an exposed
metal connector, it could result in an electric short.
11) Install the water tank.
The project is done. This is how the machine should look like now. The top machine has the
standard controller with red LED. The bottom machine has the optional controller with blue LED.
23

Related product manuals