EasyManua.ls Logo

AUTOMATION 2000 DGPT2-IB - Tightening Precautions; Leakproofness Precautions

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TIGHTENING PRECAUTIONS
When you tighten the HM8 bolts on the DGPT2
®
fixing hooks, make sure that:
The tighten coupling is not higher than 3 m.kg (30 N.m).
The DGPT2
®
attachment flange DOES NOT TOUCH the transformer cover
(the FPM seal should stay visible approx. 1 or 2 mm).
The DGPT2
®
fixing hooks are tightened one after the other, clockwise in two
steps. During the first step, use a loose tighten coupling on all fixing hooks.
During the second step, use a tighten coupling not higher than 3 m.kg
(30 N.m).
LEAKPROOFNESS PRECAUTIONS
The DGPT2
®
drain tap’s leakproofness is insured by a FPM seal positioned at the root of
the screw thread undercut.
NEVER USE Teflon
®
tape (or similar tape) to insure the DGPT2
®
drain tap’s
leakproofness through its screw thread.
AUTOMATI ON 20 0 0
TECH. INSTRUCTIONS
Page
T/NOT-0021 Date: 28/09/16
Rev.
7
DGPT2
®
4

Related product manuals