EasyManua.ls Logo

AUX ANB78FVAMT - Page 120

AUX ANB78FVAMT
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AUX-DC inverter ARV outdoor unit individual series technical manual
117
Calculate the critical thickness through following steps, and take necessary actions.
1) Calculate the refrigerant charge volume A, A= factory charge volume + additional charge volume
2) Calculate the indoor area volume (B) (as the minimum volume)
3) Calculate the refrigerant thickness, A/B ≤ critical thickness 0.3kg/m
3.
Note:
In winter, supply power 8 hours in advance for initial operation so that crankshaft case can be preheated
in advance.
In winter, after main power supply is interrupted for 8 hours, conduct trial operation again only after 2.5
hours of power-on.

Table of Contents

Related product manuals