EasyManua.ls Logo

Avalon A9 - Page 25

Avalon A9
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
Finishing the Water Cooler Installation
Be sure to dispense a little water from both the hot and cold buttons prior to
flipping on the heating (#9) and cooling (#8) switches located on the back of the machine.
8. Once the heating switch (#9) is turned on (I),
it will take 15-20 minutes for the water to
reach it's desired hot temperature.
15-20
min
Hot
1 hr
Cold
9. Once the cooling switch (#8) is turned
on (I), it will take up to 1 hour to reach the
desired cold temperature.
Getting Started

Related product manuals