WWW.BALTIMOREAIRCOIL.COM
4
WWW.BALTIMOREAIRCOIL.COM
4
Figure 1. Series 3000 Cooling Tower
SERIES 3000 COOLING TOWER
Unit Operation and Storage
1
Start-Up Procedure
General
• Iftheunitismountedonvibrationisolatorsorisolationrails(byothers),refertothe
vibrationisolationmanufacturer’sguidelinesbeforeloading/unloadingweightfromthe
unit.
• Verifythefanandsystempumpmotorsaredisconnected,lockedout,andtaggedout.
BALTIDRIVE
®
PowerTrain
HotWater
BasinandCover
ColdWater
Basin
FanDeck
AirIntakeLouvers
FanGuard
TopWaterInlet
Casing
Make-upValve
AdjustableFloat
WaterOutlet
Connection
Suction
Strainer
BACross
®
Fillwith
IntegralDrift
Eliminators
DANGER: Do not perform any
service on or near the fans, motors,
and drives, or inside the unit
without first ensuring that the
fans and pumps are disconnected,
locked out, and tagged out.