Do you have a question about the BAC S3E-1222-14 Series and is the answer not in the manual?
Adequate precautions for installation and location to safeguard equipment and public.
Check unit upon delivery for received items and shipping damage before signing bill of lading.
Details on anchoring the unit to support beams using provided holes and anchor bolts.
Refer to table and figures for spreader bar and vertical dimension for lifting.
Instructions for assembling single-cell cooling towers, focusing on two-piece section assembly.
Steps to assemble two-piece sections, including sealing, alignment, and bolting for leak-free operation.
Guidance for installing multi-cell cooling towers, including orientation and flume box integration.
Procedures for installing fan guards to ensure safety during operation.