RIGGING & ASSEMBLY INSTRUCTIONS
Series 3000 Cooling Tower
Series 3000
Question and Answer IconNeed help?

Do you have a question about the BAC S3E-1424-14 Series and is the answer not in the manual?

BAC S3E-1424-14 Series Specifications

General IconGeneral
Storage4x 3.5"
RAID SupportRAID 0, 1, 5, 10
Expansion Slots1x PCIe 3.0 x16
NetworkingDual Gigabit Ethernet
Operating System SupportLinux

Summary

Introduction

Safety

Precautions for installation and location to safeguard equipment, premises, and public.

Pre-Rigging Checks

Inspect unit for received items and shipping damage before signing bill of lading.

Anchoring

Bolt unit to support beams using 7/8" holes; ensure unit is level for proper operation.

Unit Rigging & Assembly

Rigging Procedures

Guidelines for lifting devices, spreader bars, and vertical dimensions for unit sections.

Single-Cell Installation

Instructions for assembling single-cell units, including two-piece section assembly.

Two Piece Section Assembly

Assemble lower section, seal flanges, and secure upper section using alignment guides.

Fan Guard Installation

Procedures for securely mounting fan guards to prevent injury during operation.

Motor Location and Conduit Installation

Guidance on electrical conduit installation for various motor and drive systems.