RIGGING & ASSEMBLY INSTRUCTIONS
Series 1500 Cooling Tower
Series 1500
Question and Answer IconNeed help?

Do you have a question about the BAC XES15E-1212-09 Series and is the answer not in the manual?

BAC XES15E-1212-09 Series Specifications

General IconGeneral
BrandBAC
ModelXES15E-1212-09 Series
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Safety

Adequate precautions for installation and location to safeguard equipment, premises, and public.

Pre-Rigging Checks

Check unit upon delivery for required items and shipping damage before signing bill of lading.

Unit Weights

Verify weight of each section from the unit certified drawing; accessories add weight.

Anchoring

Seven-eighths (7/8") diameter holes in basin flange for bolting unit to supports. Unit must be level.

Rigging & Assembly

Rigging

Refer to Table 1 and Figures 1 and 2 for required spreader bar and vertical dimension 'H'.

Single-Cell Installation

Single cell 1500 Cooling Towers are designed to be lifted in one assembled piece.

Two Piece Section Assembly

Instructions for proper rigging of sections for units that ship in two sections.

Multi-Cell Installation

Refer to submittal drawings for proper orientation of each cell.

Multi-Cell Unit Assembly

Attach first cell's lower section, then upper section; assemble subsequent cells adjacent.

Motor Location and Conduit Installation

Use following when installing electrical conduit for Series 1500 Cooling Towers.

Optional Accessory Installation