RIGGING & ASSEMBLY INSTRUCTIONS
Series 1500 Cooling Tower
Series 1500
Question and Answer IconNeed help?

Do you have a question about the BAC XES15E-1285-06 Series and is the answer not in the manual?

BAC XES15E-1285-06 Series Specifications

General IconGeneral
BrandBAC
ModelXES15E-1285-06 Series
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Safety

Precautions for installation and location to safeguard equipment, premises, and public.

Anchoring

Details on provided holes for bolting the unit to supports and ensuring it is level for proper operation.

Rigging & Assembly

Rigging

Refer to table and figures for required spreader bar and vertical dimension for lifting the unit.

Single-Cell Installation

Describes lifting a single-cell cooling tower in one assembled piece as shown in figures.

Two Piece Section Assembly

Steps for assembling two-section units, including sealing flanges and alignment with drift pins.

Multi-Cell Installation

Orientation of cells, flume boxes for equalization, and multi-cell unit assembly procedures.

Motor Location and Conduit Installation

Installing electrical conduit for Series 1500 Cooling Towers, including water tight and pitched downward requirements.

Optional Accessory Installation

Ladder Safety Cage (Optional)

Reassembling and bolting the safety cage to the ladder using specific locations and quantities based on height.

Motor Removal System with Davit Arm (Optional)

Factory pre-installed brackets, davit socket assembly, and arm placement for safe motor removal.

Heater Control Panel (Optional)

Planning control panel location, mounting, wiring, and connections for heater systems.