RIGGING & ASSEMBLY INSTRUCTIONS
Series 1500 Cooling Tower
Series 1500
Question and Answer IconNeed help?

Do you have a question about the BAC S15E-1212-09 Series and is the answer not in the manual?

BAC S15E-1212-09 Series Specifications

General IconGeneral
RefrigerantR410A
SeriesS15E-1212-09
ModelS15E-1212-09
Cooling Capacity12000 BTU/h
Power Supply220-240V, 50Hz

Summary

Introduction

Safety

Adequate precautions for installation, location, and fan speed to prevent injury or damage.

Pre-Rigging Checks

Thorough inspection of received items for shipping damage before signing bill of lading.

Rigging & Assembly

Rigging

Details required minimum spreader bar and vertical dimension for lifting units.

Single-Cell Installation

Instructions for lifting and assembling single-cell cooling towers.

Two Piece Section Assembly

Procedure for joining upper and lower sections of two-piece cooling towers.

Multi-Cell Installation

Guidance on orienting and connecting multi-cell cooling tower units.

Optional Accessory Installation

Ladder Safety Cage

Instructions for reassembling and bolting the ladder safety cage to the ladder.

Motor Removal System with Davit Arm

Steps for installing and operating the motor removal system with davit arm.

Heater Control Panel

Instructions for planning, mounting, and connecting the optional heater control panel.