EasyManua.ls Logo

Bachmann Ivatt Mogul 2-6-0 - Final Bearing and Spring Fitment; Overlay and Bearing Final Check; Spring Installation and Pickup Clearance

Bachmann Ivatt Mogul 2-6-0
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bachmann LMS Ivatt 4MT 2-6-0 Copyright Brassmasters 2006
8
Both overlays fitted in place and final fitting of bearings
If not using the plastic keeper plate remove springs (15) from etch and note the small cut out at the on
the hanger this is to allow the sprung pick ups to pass the springs, the cut out can be enlarged whilst in
position on the chassis if necessary. Check fit of springs and fix into place. Adjust and temporarily fit
coupling rods in place.
Bearings and springs fitted

Related product manuals