13
Assembly Instrucons
Step 15
Screw in BOLT M6*12 (BB) - 2 PCS
halfway on the rebox (35) as
shown in Fig. 5a.
Slide in the two screws in opening
(Fig. 5b) to hold the rebox in
posion. Using M6*12 (BB) - 9 PCS,
fasten the rebox in place and
ghten all screws.
Step 16
Align and place gas lid on top of the
body (le side). Place PIN ROLL (GG)
- 2 PCS though the hinges and secure
with COTTER PIN (FF) - 2 PCS.
Align and place charcoal lid on top of
the body (right side). Place PIN ROLL
(GG) - 2 PCS through the hinges and
secure with COTTER PIN (FF) - 2 PCS.