EasyManua.ls Logo

Backyard PRO - Step 15: Firebox Attachment; Step 16: Lid Securing

Backyard PRO
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Assembly Instrucons
Step 15
Screw in BOLT M6*12 (BB) - 2 PCS
halfway on the rebox (35) as
shown in Fig. 5a.
Slide in the two screws in opening
(Fig. 5b) to hold the rebox in
posion. Using M6*12 (BB) - 9 PCS,
fasten the rebox in place and
ghten all screws.
Step 16
Align and place gas lid on top of the
body (le side). Place PIN ROLL (GG)
- 2 PCS though the hinges and secure
with COTTER PIN (FF) - 2 PCS.
Align and place charcoal lid on top of
the body (right side). Place PIN ROLL
(GG) - 2 PCS through the hinges and
secure with COTTER PIN (FF) - 2 PCS.

Related product manuals