EasyManuals Logo

Baxi Duo-tec Combi HE a Range Installation And Servicing Instructions

Baxi Duo-tec Combi HE a Range
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
18
© Baxi Heating UK Ltd 2012
7.0 Site Requirements
7.7 Condensate Drain (cont.)
11. When discharging condensate into a soil stack or waste
pipe the effects of existing plumbing must be considered. If
soil pipes or waste pipes are subjected to internal pressure
fluctuations when WC's are flushed or sinks emptied then
back-pressure may force water out of the boiler trap and
cause appliance lockout.
Boiler
2.5° Minimum fall
iii) Termination to a drain or gully
Boiler
500mm min
2.5° Minimum fall
iv) Termination to a purpose made soakaway
Holes in the soak-away must
face away from the building
50mm per metre of pipe run
50mm per metre of pipe run
Further specific requirements for soakaway
design are referred to in BS 6798.
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°

Other manuals for Baxi Duo-tec Combi HE a Range

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baxi Duo-tec Combi HE a Range and is the answer not in the manual?

Baxi Duo-tec Combi HE a Range Specifications

General IconGeneral
BrandBaxi
ModelDuo-tec Combi HE a Range
CategoryBoiler
LanguageEnglish

Related product manuals