EasyManua.ls Logo

Bayside 4560012 - Mattress Support Slats Installation; Guardrail Post Attachment

Bayside 4560012
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Assembly Instructions
7. Lay out the upper mattress support slats (M) between the upper side rails (G and H), ensuring that every
slot has a slat. Insert two screws (EE) through the countersunk holes in each slat and securely
screw into place.
8. Now, attach the front guardrail post (K) to the front side of the upper ladder side rail (G) using two bolts
(BB) through the drilled holes on the post and screw into the inserted nuts on the side rail.
EE
EE
H
M
G
C
G
M
H
D
K
G
K
G
BB
C
D
G
K

Related product manuals