EasyManua.ls Logo

Beijer Electronics X2 extreme 7 - Installation; Space Requirements; Installation Process and Connections

Default Icon
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
3Installation
3.1 SpaceRequirements
Maximum installation plate thickness: 7 mm .
Installation plate thickness range: 2 - 7 mm +/- 0.1 mm.
The following drawings show the space requirements in millimeters when
installing the operator panel. The drawings are only illustrative and may be out of
proportion.
3.2 InstallationProcess
The following is needed:
A Phillips/slot screwdriver
Do the following:
1.
Unpack and check the delivery. If damage is found, no tify the supplier.
Note:
Placetheoperato
rpanelonastablesurfaceduringinstallation.
Droppingtheope
ratorpanelorlettingitfallmaycausedamage.
2.
To cu t a co rre
ct opening for the operator panel, use the cut out dimensions
in the outl
ine drawing. A separate cut out drawing is available for download
from the B
eijer Electronics web site. For more information, see sections
Operator
Panel Drawings and Technical Data.
BeijerElectronics, MAEN249B
11