Fixing the end run brackets
topping the movement, in the opening phase and in the closing phase, takes place via
the end run brackets FRD.1, which, relevantl
fixed onto the rack, make the end run
spr
ix the brackets FRD 1, proceed as
ollows:
1 -Take the leaf to the desired openin
position. If a stop block is present on the
round,
the leaf must stop 2
, effects switch-over of the internal switch, which can be perceived with a
- Fix the bracket temporarily via the two screws supplied
- Place the left bracket FRD.1 on the rack and make it slide until the end run sprin
the internal switch, which can be perceived with a
.
6 - Fix the bracket as indicated in
, use a hacksaw to shorten the end
the rack, so
that it does not project with respect to the plumb line o
In the inspection phase, use several opening and closing manoeuvres to
check whether the end run intervenes in the correct opening and closing
points, before the respective mechanical profiles.
, move the brackets FRD.1 to advance or dela
use a
drill (45 mm point), to make the holes with depth o
about 2 mm in correspondence with
the si
or the screws is created in this way, which
uarantees the stability o
that a space of about 1 mm remains
slide and take the driving gear near
to the second
.
6 - Proceed in the same way
every time in a way always to have the correct
.
7 - Now continue with the remainin
ous one
as indicated in Fi
ure 19, in a way to keep the rack