EasyManua.ls Logo

Berner BI1EGSP - Installation Instructions - Mounting Frame (Ver. A); Surface Cutout and Seal Application; Unit Insertion and Final Sealing

Berner BI1EGSP
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 33 of 44 17.07.2014
Ver. 3.3 © Berner Kochsysteme 2015
Installation instructions for the installation of Berner
Induction units with mounting frame (Ver. A)
Please observe the following installation instructions. The only way to ensure trouble-
free operation and a long service life. To ignore the following guidelines will void the
warranty.
Making the cut in the surface in accordance with the
installation drawing. (Please only use detailed
drawings).
Use only suitable materials (stainless steel at
least 3mm or granite).
Assembling of the seal (pactan) without breaks to avoid
a later leak in the seal.
Insert the Unit into the cut out and set it to the final
position.
Complain of the unit and remove the rest of pactan from
the frame with the suitable tool
Important: Dry time at least 24 hours. Closed seals dry
even less.

Table of Contents

Related product manuals