EasyManua.ls Logo

Bertazzoni Master Series - Installation Checklist; Final Installation Checklist

Bertazzoni Master Series
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION CHECKLIST
A qualified installer should carry out the following checks:
Range mounted on its legs
Island trim or Backguard attached according to
instruction
Anti-tip device properly installed
Clearance to cabinet surfaces as manufacturer’s
guideline
Proper ground connection
Gas service line connected following
manufacturer’s guideline
Valves, stoppers and gasket installed between the
range and the service line
Gas connection tested and free of gas leaks
Range settled for the type of gas available in the
household
Each burner lights satisfactorily, both individually
and with other burners operating
Flame appear sharp blue, with no yellow tipping,
shooting or flame lifting
Minimum settled for all burners
Oven and broiler lights satisfactorily and works
properly
Oven light works properly.
30

Other manuals for Bertazzoni Master Series

Related product manuals