EasyManua.ls Logo

Beta 250-300 RR User Manual

Beta 250-300 RR
5 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
2013-2014 250-300 RR
Set Up Instructions
8/2013
Question and Answer IconNeed help?

Do you have a question about the Beta 250-300 RR and is the answer not in the manual?

Beta 250-300 RR Specifications

General IconGeneral
BrandBeta
Model250-300 RR
CategoryMotorcycle
LanguageEnglish

Summary

Motorcycle Setup and Preparation

Uncrate Motorcycle and Remove Packing

Remove all protective materials, packaging, and items from the motorcycle crate.

Install Handlebars

Mount handlebars using supplied 8mm bolts and upper clamp bracket, torquing to 25 Nm.

Remove Crate Securing Straps

Carefully cut tie straps securing the motorcycle to the crate, ensuring it remains stable.

Install Headlight Assembly

Connect electricals and mount the headlight mask to the front fender brace.

Route Front Brake Line and Speedometer Wire

Feed the front brake line and speedometer wire through the headlight mask grommet.

Prepare and Install Skid Plate

Enlarge skid plate holes, install spacers, and attach with clips and bolts.

Install Frame Guards

Fit frame guards with zipties and a bolt into the swingarm pivot.

Prepare and Install Air Filter

Apply grease to the air filter's inner edge and ensure it is installed securely.

Prepare and Install Battery

Prepare the battery by filling, sealing, and charging, then install it.

Final Checks and Completion

Review checklist for pre-delivery inspection and complete setup.

Related product manuals