EasyManua.ls Logo

Beta RR 4T - 525 - Page 96

Beta RR 4T - 525
215 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fitting the oil line
- Position oil line 3 and fasten it with the two oilway screws 1
and 2, using new seal rings. Tightening torque: 10 N·m.
Position the oil line so that it does not come into contact
with the engine. Also, when tightening, ensure that the oil
line is not taut.
Installing the starter motor
Carefully oil the O-ring on the starter motor and insert the mo-
tor in the crankcase. Fit the two screws 4 (M6x20) and tighten
them to 8 N·m.
Oil distance ring 5 and slide it onto the driven shaft with the
groove for the O-ring facing inward.
Fit the chain sprocket with the high collar facing inward.
Degrease the flange nut thread, apply Loctite 243 to it and
tighten the screw with the spring washer to 60 N·m.
NOTE: Before tightening the screw, lock the crankshaft and shift
into first gear.
69
6 - Engine Release 00 Date 02/2005
1
2
3
4
5

Related product manuals