EasyManua.ls Logo

Billy Goat OS900SPS - Packing Checklist and Assembly; Packing Checklist; Assembly Instructions

Billy Goat OS900SPS
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part No 351502 Form No F030311A
8
OS900SP Owner’s Manual
PACKING CHECKLIST
Your Billy Goat Overseeder is shipped from the factory in one carton, completely assembled.
PUT OIL IN ENGINE BEFORE STARTING
ASSEMBLY
READ all safety instructions before assembling unit.
TAKE CAUTION when removing the unit from the box the Handle Assembly is attached to the
unit and cables could snag.
1. UNFOLD the upper handle and slide handle lock loops (item 35) into place to secure the upper handle to the
lower.
2. CHECK engine oil level and fill to proper level with engine manufacturers recommended grade of oil. Move
height adjust lever to down position, to level engine during checking. See engine manufacturers’ instruction
manual.
3. CONNECT spark plug wire.
Boxing Parts
Checklist
Subaru 9 HP
Honda 9 OHV
Parts bag
P/N-351009
PARTS BAG &
LITERATURE ASSY
Warranty card P/N- 400972, Owner’s Manual P/N-351502, Declaration of Conformity P/N-351508.

Related product manuals