EasyManuals Logo

BK Precision 1672 Installation Manual

BK Precision 1672
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
9.4 TEST EQUIPMENT REQUIREMENTS
(only required when doing a performance verification test)
The following instruments will be required to test the complete installa-
tion of the unit.
1). A 4½ Digit Multimeter for verifying the output voltage and current.
2). A 20 MHz dual channel oscilloscope for verifying the Ripple in the DC
Output/s.
3). A Resistive load to suit the maximum output current from the unit de-
pending on the model and capacity.
4). A Standard calibrated current shunt to measure the output current.
15

Other manuals for BK Precision 1672

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BK Precision 1672 and is the answer not in the manual?

BK Precision 1672 Specifications

General IconGeneral
BrandBK Precision
Model1672
CategoryPower Supply
LanguageEnglish

Related product manuals