EasyManua.ls Logo

Blaupunkt CDC-RF6IR - Page 9

Blaupunkt CDC-RF6IR
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Vertical Installation
onfinn
that Anti-Vibration
Switches on both left and
right sides are set to position
V,
l
Attach brackets (L) and (R)
using the hexagonal bolts
(M5
x 8).
l
Attach brackets (L) and (R) to
their respective brackets (B)
using the hexagonal bolts
(M6 x 20) and the hexagonal
nuts (MS).
l
Pull back the carpet and determine
where to attach the unit.
l
Stick the supplied double-sided tape
to the bottom of the brackets (B) and
peel off the paper backing.
l
Affix the unit to the floor by pressing
in place.
l
Once more, use the hexagonal nuts
to
attach the
changer on
top of the