EasyManua.ls Logo

Blizzard BCF20 - Installation; Cabinet Location and Installation Guidelines

Blizzard BCF20
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
IMPORTANT SAFETY INSTRUCTIONS, READ CAREFULLY
AND KEEP FOR FUTURE REFERENCE
INSTALLATION
IMPORTANT!!! PLEASE READ BEFORE INSTALLATION
If the unit has recently been transported. Please let unit stand still for a minimum of 24 hours
before plugging it in.
Make sure that there is proper ventilation around the unit in the where it will operate.
Make sure all accessories are installed before plugging the unit in.
Please read through the manual in its entirety.
Disposal of old equipment should be done responsibly as per WEEE regulations and local
authority directives.
CABINET LOCATION AND INSTALLATION GUIDELINES
Unpacking
The unit is delivered on a pallet and shrink-wrapped. Documentation is inserted into a clear
pocket located inside the unit. Carefully remove the protective plastic film and cardboard from
the unit exterior and from the door opening surround making sure that any sharp instrument
used does not cause damage, plus remove any quality labels.
Install the unit on strong and leveled surfaces
unit may make unpleasant noises if surface is uneven
unit may malfunction if surface is uneven
If the floor is not flat, please use something to make sure the base of this unit in horizontal
level
Install the unit in an indoor, well-ventilated area
unit performs more efficiently in a well-ventilated area Ensure the maximum design ambient
temperature is not exceeded
for best performance, please maintain clearance of 100mm / 4 on the back of the unit,
50mm / 2 on the top of the unit.