EasyManua.ls Logo

BLOWTHERM PACK-P AR 93 - User Manual

Default Icon
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTRUCTIONS MANUAL FOR BOILERS MODELS:
1460040EN
Updated 04/2009
PACK-P AR 93 PACK-P AR 810
PACK-P AR 105 PACK-P AR 930
PACK-P AR 150 PACK-P AR 1045
PACK-P AR 190 PACK-P AR 1100
PACK-P AR 230 PACK-P AR 1250
PACK-P AR 290 PACK-P AR 1600
PACK-P AR 345 PACK-P AR 1800
PACK-P AR 405 PACK-P AR 2000
PACK-P AR 465 PACK-P AR 2500
PACK-P AR 520 PACK P-AR 3000
PACK-P AR 580 PACK P-AR 3500
PACK P-AR 695
0085

Questions and Answers

Summary

General Information

General Warnings

Crucial safety and usage guidelines for the boiler and manual.

Certification and Compliance

Details EC mark attestation and conformity to European Directives and standards.

Safety Rules

Essential rules for safe operation, handling, and maintenance of the appliance.

Appliance Description

Overview of the boiler's configuration, components, and operating principles.

PACK-P;AR 93-405 Dimensions and Technical Features

Technical data and physical dimensions for PACK-P/AR models 93 through 405.

PACK-P;AR 465-1100 Dimensions and Technical Features

Technical data and physical dimensions for PACK-P/AR models 465 through 1100.

PACK-P;AR 1250-3500 Dimensions and Technical Features

Technical data and physical dimensions for PACK-P/AR models 1250 through 3500.

Identification Elements

Information on identifying the boiler via its technical data plate.

Delivered Documents

Lists the essential documents provided with each boiler for reference and warranty.

Standard Instrument Panel

Details the components and function of the standard electrical control panel.

Standard Electrical Diagram

Wiring diagram for single-stage burners, essential for installation.

Electrical Diagram for 2-Stage Burners

Wiring diagram specific to boilers with two-stage burners.

User Operations

Start-Up Procedures

Step-by-step guide for initial boiler start-up and automatic operation.

Turning Off the Boiler

Instructions for safely turning off the boiler for temporary or long periods.

Cleaning the Appliance

Guidance on how the user can clean the exterior of the boiler.

User Maintenance

Explains required periodic maintenance checks by the user for optimal performance.

Product Receipt Details

Information regarding the contents received with the boiler upon purchase.

Installation Procedures

Packaging and Handling

Instructions on how the boiler is packaged and should be handled.

Boiler Room Installation Requirements

Specifies requirements for the installation room, ventilation, and placement.

Combustion Products Discharge

Details the importance of correct flue coupling and discharge for efficiency and safety.

Hydraulic Connections

Recommendations for correct hydraulic connections, safety valves, and expansion vessels.

Water Supply Considerations

Guidelines on water pressure, quality, treatment, and avoiding contamination.

Working Temperature Limits

Specifies the maximum working temperature and acceptable temperature differences.

Condensate Problem and Prevention

Addresses the issue of condensate formation and methods to prevent it.

Standard Heating Installation Diagram

A schematic showing typical heating system components and their connections.

Electrical System Requirements

Outlines compliance with regulations and safety for the electrical system installation.

Control Panel Installation

Instructions for mounting and connecting the boiler's control panel.

Fuel Supply Line

Requirements for installing the fuel supply line according to regulations.

Possible Fuels

Lists the types of fuels compatible with the PACK P/AR boilers.

Burner Connection

Guidelines for connecting the burner, including electrical and setting aspects.

Cover Assembling (Models 93-1045)

Specific instructions for assembling the cover panels on certain boiler models.

Pre-Start Up Operations

Essential checks and preparations required before the first boiler start-up.

First Start-Up Procedure

Detailed steps for powering on the boiler and initiating its first operational cycle.

First Start-Up and Further Checks

Procedures for testing the appliance after initial start-up and performing subsequent checks.

Service and Maintenance

Warnings for Service Personnel

Important safety and operational guidelines for authorized service technicians.

Routine Maintenance Schedule

Outlines regular maintenance tasks essential for boiler longevity and performance.

Door Opening and Adjustment

Instructions on how to open, adjust, and maintain the boiler door.

Boiler Cleaning Procedures

Steps for cleaning the boiler's internal heat transfer surfaces and tubes.

Post-Cleaning Checks

Essential checks to perform after completing boiler cleaning operations.

Troubleshooting Common Faults

Identifies common boiler faults and provides remedies for resolution.

Spare Part Recommendations

Lists recommended spare parts for typical operational periods and emergencies.

Warranty Conditions

Outlines the terms and conditions required for the boiler's warranty to be valid.

BLOWTHERM PACK-P AR 93 Specifications

General IconGeneral
BrandBLOWTHERM
ModelPACK-P AR 93
CategoryBoiler
LanguageEnglish

Related product manuals