EasyManua.ls Logo

BONAIRE VSS50 User Manual

BONAIRE VSS50
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Bonaire Integra
&
Fresh Air Conditioning
Installation Instructions
VSS50, 55 VSM60, 65
VSL70, 75
Question and Answer IconNeed help?

Do you have a question about the BONAIRE VSS50 and is the answer not in the manual?

BONAIRE VSS50 Specifications

General IconGeneral
BrandBONAIRE
ModelVSS50
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction and Responsibilities

Important Notes

Copyright, reproduction rights, and product development policy.

Dealer and Installer Responsibilities

Obligations for trained staff, sub-contractors, and compliance with regulations.

Legal and Statutory Obligations

Compliance with codes, standards, and legal requirements for installation.

Safety and O.H.&S. Requirements

Ensuring safe installation environment, access for service, and safety anchorages.

Pre-Installation Checks

Checks for damaged products, system components, correct unit, and design conformity.

Unit Location Guidelines

Unit Location Checklist

Guidelines for unit placement regarding noise, air sources, structural support, and service access.

Unit Installation Procedures

Installing the Dropper Duct

Instructions for installing the metal dropper duct, including size, height, and fixing requirements.

Installing the Enviroseal Duct Shutter

Steps for installing the Enviroseal duct shutter, ensuring correct placement and operation.

Air Conditioner Installation - Louvres and Fan Removal

Procedures for removing louvre panels and the fan/venturi assembly for easier handling.

Air Conditioner Installation - Lifting and Securing

Guidelines for storing fan assembly, lifting unit, locating on dropper duct, and securing it.

Air Conditioner Installation - Cable Connections

Reconnecting fan loom, water solenoid, communication cables, and feeding service lead.

Installing the Duct Work

Requirements for insulated ductwork, bends, joins, and sealing for optimal airflow.

Ductwork Installation Visual Guide

Visual guide for insulated ductwork, sealing joints, and smooth radius bends for airflow.

System Connections

Water Management Importance

Importance of correct water management for operation, longevity, and warranty.

Fitting the Float Valve

Procedures for fitting the float valve, including washer placement and nut tightening.

Connecting the Water Supply

Requirements for water supply pipework, plumber installation, and pressure limits.

Inlet Water Supply Details

Details on flexible connections, freeze protection, pipe material, and isolating valves.

Water Drain Connections

Steps for fitting the overflow assembly, including washer placement and securing the nut.

Fitting The Overflow Assembly

Detailed steps for installing the 50mm BSP overflow fitting.

Fitting the Enviroflow Water Conservation System

Installation steps for the Enviroflow system, including dump valve and cable connections.

Drainage Provisions Overview

Requirements for discharge pipe diameter and managing discharge water per regulations.

Drainage Discharge Options 1-3

Options for discharging drain water into roof gutters, downpipes, or stormwater systems.

Drainage Discharge Option 4

Sanitary drainage options via tundish to floor waste gully or direct to sanitary drain.

Drainage Discharge Options 5-6

Options for discharging drain water to an absorption pit or a water spreader.

Electrical Installation Notes

Important notes for electrical connections, emphasizing licensed electricians and dedicated circuits.

Electrical Wiring Connections

Instructions for licensed electricians to install dedicated circuits and GPOs.

Electrical Installation Details

Details on drilling holes, fitting grommets, connecting cables, and securing electrical leads.

Electrical Wiring Diagram

Schematic illustrating electrical connections for the unit's components.

Commissioning and Hand Over

Water Levels Setup

Instructions for filling the unit and checking water levels relative to the overflow pipe.

Water Level Verification Steps

Procedure for filling the unit and verifying the correct water level.

Dialflow Settings Adjustment

Adjusting filter rate and bleed-off rate using control knobs for water flow.

Filter Rate Adjustment

How to adjust the outer knob to control water flow to the distributor.

Bleed-off Rate Adjustment

Setting the bleed rate using the inner knob to prevent mineral deposits.

Dialflow and Bleed Rate Settings

Adjusting bleed rate for water hardness and recommendations for plumbing bleed off.

Dump Valve Settings

Setting dump valve timed periods based on water hardness and control options.

Fan Operation Check

Checking fan running, clearance, and even air distribution through ductwork.

Control System Reference

Reference to separate control installation and commissioning instructions.

Customer Hand Over Instructions

Instructing the customer on product operation, controls, and maintenance.

Commissioning Checklist

A checklist for verifying unit installation, connections, and functionality.

Ductwork and General Installation Checks

Checks for Enviroseal operation, roof penetrations, ductwork airtightness, and air distribution.

Site Cleanliness Verification

Ensuring the site is clean from rubbish after installation.

Customer Hand Over Explanations

Key points to explain to the customer regarding operation and maintenance.

Service Information

Importance of Periodical Service

Importance of periodical service by qualified technicians for efficiency and warranty.

Related product manuals