Bonaire Integra
&
Fresh Air Conditioning
Installation Instructions
VSS50, 55 VSM60, 65
VSL70, 75
Question and Answer IconNeed help?

Do you have a question about the BONAIRE VSL75 and is the answer not in the manual?

BONAIRE VSL75 Specifications

General IconGeneral
BrandBONAIRE
ModelVSL75
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Important Notes

Copyright and product development rights reserved by Climate Technologies.

Dealer / Installer Responsibility

Covers dealer obligations for staff training, legal compliance, and safety requirements.

Safety and O.H.&S. Requirements

Ensures installer safety, safe access for service, and necessary roof safety measures.

Before Commencing

Checks for damaged products, system components, correct unit, and design conformity before installation.

Unit Location

Unit Location Check List

Guidelines for optimal unit placement considering noise, access, and structural integrity.

Unit Installation

Installing the Dropper Duct

Instructions for installing the metal dropper duct, including sizes and height adjustments.

Installing the Enviroseal Duct Shutter

Steps for correctly installing the Enviroseal duct shutter for proper operation and sealing.

Installing the Air Conditioner

Procedure for removing louvre panels and fan/venturi assembly, lifting, securing unit, and connecting cables.

Installing the Duct Work

Guidelines for using insulated ductwork, bends, joins, and ensuring airtightness for optimal airflow.

Connections

Water Management

Importance of correct water management for operation and longevity; definition of hard water.

Inlet Water

Steps for fitting the float valve assembly and connecting the water supply pipework.

Water Drain Connections

Instructions for fitting the overflow assembly and detailing various drainage provisions.

Electrical

Guidelines for licensed electricians, dedicated circuits, and avoiding extension cords for safety.

Commissioning

Water Levels

Procedure for filling the unit and setting the correct water level relative to the overflow pipe.

Dialflow Settings

Adjusting filter rate (outer knob) and bleed-off rate (inner knob) for optimal performance.

Dump Valve Settings

Setting dump valve times for regular timed dumping based on water hardness conditions.

Fan Operation

Checking fan running, venturi clearance, and air distribution through ductwork.

Controls

Reference to separate instructions for control installation and commissioning procedures.

Customer hand Over

Instructing the customer on product operation, controls, and essential maintenance requirements.

Commissioning Check List

A checklist to ensure all installation and operational aspects are completed and verified.

Service