Bonaire Integra
&
Fresh Air Conditioning
Installation Instructions
VSS50, 55 VSM60, 65
VSL70, 75
Question and Answer IconNeed help?

Do you have a question about the BONAIRE VSM65 and is the answer not in the manual?

BONAIRE VSM65 Specifications

General IconGeneral
BrandBONAIRE
ModelVSM65
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction and Responsibilities

Important Notes

Copyright, rights reserved, and product development rights.

Dealer and Installer Responsibility

Outlines dealer duties regarding training, legal compliance, and safety requirements.

Safety and OH&S Requirements

Ensures safe installation environment and access for service, following state codes.

Before Commencing Installation

Checks for undamaged components and system design conformity before starting installation.

Unit Location Guidelines

Unit Location Checklist

Guidance on selecting a suitable location considering noise, access, and structural support.

Unit Installation Procedures

Installing the Dropper Duct

Instructions for fitting the metal dropper duct, including size and height recommendations.

Installing the Enviroseal Duct Shutter

Steps for correctly installing the Enviroseal duct shutter below the dropper duct.

Installing the Air Conditioner Unit

Procedures for removing louvre panels and the fan/venturi assembly for installation.

Installing the Duct Work

Guidelines for using insulated ductwork, bends, joins, and ensuring airtightness.

System Connections

Water Management and Inlet Water

Details on float valve fitting, water pressure, and solenoid valve connection.

Water Drain Connections

Instructions for fitting the overflow assembly and drainage provisions.

Enviroflow Water Conservation System

Steps for installing the water conservation system and dump valve mechanism.

Electrical Wiring and Safety

Important notes on 240-volt connections, licensed electricians, and circuit requirements.

Commissioning and Hand Over

Water Levels and Dialflow Settings

Adjusting water levels, float valve arm, and filter/bleed rates using the Dialflo system.

Dump Valve and Fan Operation

Settings for dump valve timing and checking fan operation for even air distribution.

Customer Hand Over Procedures

Instructing the customer on controls, bleed off, venting, and maintenance.

Commissioning Checklist

A checklist to verify all installation and operational aspects are complete.

Service and Maintenance

Service and Maintenance Requirements

Guidelines for qualified technicians and recommended periodical service for efficiency.