EasyManua.ls Logo

Bond 52661 - OPERATION; Heater Preparation and Filling; Ignition and Burning Process; Initial Burn Curing

Bond 52661
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
OPERATION
1. Make sure your heater has been assembled properly.
2. Push in the shut-o gate.
3. Fill hopper with pellets. The pellets will not fall into the repot at this point since the shut-o
gate is closed.
4. Open the door, pull out the shut-o gate completely. This will allow pellets to fall into repot.
5. Squirt a small amount of lighter uid or gel onto the pellets and ignite with a butane lighter or
match and close the door.
6. Keep the door closed when using the heater. If the door is open, the heater will lose its draft
and the pellets will not burn properly.
7. During the initial burn, the high temperature powder coating goes through a curing process.
While curing, it will give o smoke during the rst 15 minutes of use. This is normal and
temporary.
8. After several hours of use you may have excess pellets piled up at the bottom of the repot,
you will need to open the door and use the re poker to stir the pellets. This only needs to be
done after several hours of use to help ensure maximum heat output.

Related product manuals