EasyManua.ls Logo

Boneco W200 - Putting into Operation

Boneco W200
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
en
PUTTING INTO OPERATION
Fill with cold tap water up to the marking.
Put the upper part back on the water base
(do not pinch cable!)
Place the BONECO W200 on a flat surface.
Lift the upper part from the water base.
1
4
2 3
Plug the power cord into a power outlet.
5
Switch on the appliance.
6

Table of Contents

Other manuals for Boneco W200

Related product manuals