EasyManua.ls Logo

Bosch C 950 - 15 Installer Checklist to be Completed by Installer Upon Installation

Bosch C 950
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Checklist to be completed by installer upon installation | 67
6 720 805 440 (2014/11)Greentherm
15 Installer Checklist to be completed by installer
upon installation
Serial Number
(8 digit serial number is located
on rating plate on right side
panel)
___ ___ ___ ___ ___ ___ ___ ___
Gas Pressure Reading
1)
1) See Chapter 4.14, page 36 and gas pressure table (to be filled out by installer)
Static
Operating
Water Pressure
Building Water Pressure
Range if on Well system
Installing Company
Installer name
Address
Phone
Table 61
Installation manual should be left with the owner after
the installation is tested and completed.

Table of Contents

Other manuals for Bosch C 950

Related product manuals