Page. 5
Step 3: INSTALLATION
1. Hold the blower on the wall.
Note the direction of the air conduction.
2. Mark the 4 mounting boreholes.
• At least one screw must be installed through a
stud.
• All hardware must be suitable for the wall’s
con
struction materials.
3. Drill the 4 x ¼'' (6.35 mm) Ø mounting boreholes.
Insert wall anchors and screw the blower to the wall.
4. Connect the ducting from the blower to the extractor
h
ood and feed to the outside.
5. Connect the blower to the extractor hood with an
e
xtension cable, if required.
Use the added connector to hard-wire to the blower, if
re
quired.
Use the wire diagram for connecting.
WARNING
•
The additional cover on the plug must always be
attached and closed for safety reasons.
•
Not
needed wires must be isolated, capped with
wire nuts and stored in a safe position.
NOTE: Confirm that the blower is securely attached to the
wall and all connections are secure.