Menu: Floor drying > Total floor drying time
The total duration is automatically calculated. For
this, the flow temperature increases by no more
than 10 K per day. If this temperature rise is
incompatible with the specific screed, extend the
total duration. This produces a corresponding
reduction in the daily increase. The first and last
stages of the flow temperature are 25 °C (fixed
value).
Example:
Maximum flow temperature (1) = 50 °C
Duration of maximum flow temperature (2) = 7 days
Max. increase/decrease in temperature per day = 5 K
Total duration of screed drying (3) = 17 days
B Set the total duration (3) for the screed drying
function.
Menu: Floor drying > Start date
B Set the start date (4) for the screed drying
function.
Menu: Floor drying > Start time
B Set the start time (4) for the screed drying
function.
Fig. 24
1d 1 day (fixed value)
1 Maximum flow temperature
2 Duration of max. flow temperature
3 Total duration of screed drying
4 Start date and start time
t Time
VL Flow temperature
2 d
50 °C 25 °C
5 K
------------------------------------------
× 7d+17d=
25
35
45
VL
C
1d 1d 1d 1d
t
2
1
3
6 720 613 058-06.1R
4

Table of Contents