EasyManua.ls Logo

Bosch SHV46C13UC/30 - Tools and Materials Needed; Tools Required for Installation; Materials Required for Installation

Bosch SHV46C13UC/30
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tools and Materials Needed
TOOLS NEEDED
Hammer
Tape Measure
Hole Saw
Slot Screwdriver
(..
Pipe Wrench
Phillips Screwdriver
Adjustable Wrench
T-20 Screw-
Wire Cutter Wire Stripper
Level
MATERIALS NEEDED
(Additional materials may be required to comply with local codes.)
,..z
Electrical Supply Cable - Minimum #14 AWG, 2 conductor, 1 ground, insulated
copper conductors rated 75°C or higher.
Hot Water Supply Line - Minimum 3/8" O.D. copper tubing or metal braided
dishwasher supply line.
Shut-off valve and fittings appropriate for hot water supply line (copper tubing/
compression fitting, or braided hose).
90° elbow with 3/8" N.RT. male threads on one leg, and sized to fit your water supply
line (copper tubing/compression fitting, or braided hose) on the other leg.
Teflon brand tape or other pipe thread compound to seal plumbing connections.
UL listed conduit connector or strain relief.
2

Related product manuals