6720887696 (2018/05) KE
Installation and maintenance instructions for specialists
Thermosiphon system, flat roof installation
TSS
TSS150-2E/FCC-2, TSS200-2E/FCC-2, TSS300-2E/FCC-2

Table of Contents

Questions and Answers

Summary

Explanation of Symbols and Safety Instructions

General Safety Instructions

Instructions for target group, intended use, risk of scalding, load bearing, storing, and working on the roof.

Product Specifications and Selection

Collector Specifications

Technical data for the collector, including dimensions, connections, and performance.

Intended Use and System Parameters

Intended Use of the System

Defines the sole purpose of the installation system and collector angle.

Required Tools and Transport Safety

Fitting the WSF Flat Roof Frame

Roof Safety During Frame Fitting

Safety warning for working on the roof during frame fitting.

6.2 Fitting Flat Profiles

6.3 Installing Profile Rails

6.5 Making the Roof Connection

7 Installing the MTSS Flat Roof Frame

Roof Safety During Frame Installation

Safety warning about working on the roof.

7.3 Fitting Upper Clamps

7.4 Fitting Base Bracket and Lower Clamps

8 Installing the Collectors

Roof Safety During Collector Installation

Safety warning for roof work during collector installation.

Installing Connection Set for 2 Collectors

8.2 Installing Collectors, WSF

8.2.2 Placing First Collector on Profile Rail

Warning and steps for placing the first collector on the profile rail.

8.2.4 Placing Second Collector

Steps for placing the second collector and connecting hoses.

Solar Hose Safety and Tightening

8.2.5 Installing Collector Clamp (Left)

8.3 Installing Collectors, MTSS

8.3.1 Installing the Collector (MTSS)

Instructions for installing collectors for MTSS1 and MTSS2.

8.3.2 Installing the Second Collector (MTSS)

Steps for installing the second collector for MTSS systems.

Solar Hose Safety During Roof Connection

8.3.3 Making the Roof Connection (MTSS)

Installing the Storage Tank

10 Hydraulic Connection

10.1 Connecting the Flow Pipe

Step-by-step guide to connecting the flow pipe.

10.2 Connecting the Return Pipe

Steps for connecting the return pipe.

10.3 Connecting Potable Water Pipe

Pressure Relief Valve and Expansion Vessel Installation

Instructions for installing pressure relief valve and expansion vessel.

Scalding Risk from Pressure Relief Valve

Warning about scalding risk from pressure relief valve.

System Examples and Commissioning

11.2 Filling the Potable Water Circuit

Potable Water Circuit Filling Safety

Steps for filling the potable water circuit safely.

11.3 Filling the Solar Circuit

Heat Transfer Medium Handling Safety

Safety precautions when handling heat transfer medium.

11.4 Carrying Out Checks

11.5 Insulating Connection Lines and Pipework

12 Environmental Protection, Shutdown, Disposal

Roof Safety During Disposal

Safety warning for roof work during disposal.

12.2 System Shutdown Procedures

Steps for safely shutting down and draining the system.

13 Maintenance and Inspection

Roof Safety During Maintenance

Safety warning for roof work during maintenance.

Component Integrity and Safety

Warning about component corrosion and securing.

Electrical Safety During Maintenance

Warning about electric shock hazards from live parts.

Checking Pressure Relief Valves

Magnesium Anode Electrical Check

Magnesium Anode Visual Check and Tank Cleaning

Summary

Explanation of Symbols and Safety Instructions

General Safety Instructions

Instructions for target group, intended use, risk of scalding, load bearing, storing, and working on the roof.

Product Specifications and Selection

Collector Specifications

Technical data for the collector, including dimensions, connections, and performance.

Intended Use and System Parameters

Intended Use of the System

Defines the sole purpose of the installation system and collector angle.

Required Tools and Transport Safety

Fitting the WSF Flat Roof Frame

Roof Safety During Frame Fitting

Safety warning for working on the roof during frame fitting.

6.2 Fitting Flat Profiles

6.3 Installing Profile Rails

6.5 Making the Roof Connection

7 Installing the MTSS Flat Roof Frame

Roof Safety During Frame Installation

Safety warning about working on the roof.

7.3 Fitting Upper Clamps

7.4 Fitting Base Bracket and Lower Clamps

8 Installing the Collectors

Roof Safety During Collector Installation

Safety warning for roof work during collector installation.

Installing Connection Set for 2 Collectors

8.2 Installing Collectors, WSF

8.2.2 Placing First Collector on Profile Rail

Warning and steps for placing the first collector on the profile rail.

8.2.4 Placing Second Collector

Steps for placing the second collector and connecting hoses.

Solar Hose Safety and Tightening

8.2.5 Installing Collector Clamp (Left)

8.3 Installing Collectors, MTSS

8.3.1 Installing the Collector (MTSS)

Instructions for installing collectors for MTSS1 and MTSS2.

8.3.2 Installing the Second Collector (MTSS)

Steps for installing the second collector for MTSS systems.

Solar Hose Safety During Roof Connection

8.3.3 Making the Roof Connection (MTSS)

Installing the Storage Tank

10 Hydraulic Connection

10.1 Connecting the Flow Pipe

Step-by-step guide to connecting the flow pipe.

10.2 Connecting the Return Pipe

Steps for connecting the return pipe.

10.3 Connecting Potable Water Pipe

Pressure Relief Valve and Expansion Vessel Installation

Instructions for installing pressure relief valve and expansion vessel.

Scalding Risk from Pressure Relief Valve

Warning about scalding risk from pressure relief valve.

System Examples and Commissioning

11.2 Filling the Potable Water Circuit

Potable Water Circuit Filling Safety

Steps for filling the potable water circuit safely.

11.3 Filling the Solar Circuit

Heat Transfer Medium Handling Safety

Safety precautions when handling heat transfer medium.

11.4 Carrying Out Checks

11.5 Insulating Connection Lines and Pipework

12 Environmental Protection, Shutdown, Disposal

Roof Safety During Disposal

Safety warning for roof work during disposal.

12.2 System Shutdown Procedures

Steps for safely shutting down and draining the system.

13 Maintenance and Inspection

Roof Safety During Maintenance

Safety warning for roof work during maintenance.

Component Integrity and Safety

Warning about component corrosion and securing.

Electrical Safety During Maintenance

Warning about electric shock hazards from live parts.

Checking Pressure Relief Valves

Magnesium Anode Electrical Check

Magnesium Anode Visual Check and Tank Cleaning

Bosch TSS150-2E/FCC-2 Specifications

General IconGeneral
ModelTSS150-2E/FCC-2
CategorySolar panel
Rated Power (Pmax)150 W
Open Circuit Voltage (Voc)22.4 V
Short Circuit Current (Isc)8.70 A
Operating Temperature-40°C to +85°C
Dimensions1482 x 676 x 35mm