EasyManua.ls Logo

bott Cubio - Cubio Erection Instructions

bott Cubio
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
english
2. Installation instructions for cubio drawer
and system cabinets
The cabinet systems should be installed so as to allow
adequate operating and movement clearance.
The cabinet housing must stand on a flat level surface
at the installation site. If the floor is uneven, the cabinets
must be aligned and erected vertically using suitable shims
(e.g. metal plates).
WARNING